Dear Visitors
Due to technical reasons, no aircraft can be supplied with any type of fuel at Tököl Airport between 13 March 2026 and 16 March 2026. If you plan to visit LHTL during this period, please make sure to take this into consideration.
Due to technical reasons, no aircraft can be supplied with any type of fuel at Tököl Airport between 13 March 2026 and 16 March 2026. If you plan to visit LHTL during this period, please make sure to take this into consideration.
PERIOD OF WORKS: 17 February 2026 – 22 February 2026 The aerodrome operator hereby informs aircraft operators and pilots that a temporary aeronautical obstacle has been erected in the vicinity of the aerodrome with the following parameters: Affected runway: 32 Location: right side of the threshold of RWY 32 Lateral distance: 225 metres from the
OFFICIAL NOTICE – TEMPORARY AERONAUTICAL OBSTACLE Read More »
As of January 1, 2026, Mr. Csaba Fónad has been appointed as the Managing Director of Master Sky Ltd. and the Head of Tököl Airport. Contact details:📞 +36 30 088 1508✉️ fonad@lhtl.hu Assistant:Mr. László Nagy Operative manager📞 +36 20 564 4003✉️ nagy@lhtl.hu We make continuous efforts to keep the airport runway and taxiways clean. Unfortunately,